Mirea Residences
Pasig
2BR 3BR
P 5,649,000 - P 8,995,000
DMCI Homes Corporate Center, 1321 Apolinario Street, Bangkal, Makati City, Metro Manila, PH 1233
F. Pasco Avenue, Santolan, Pasig City
4,437,000 - 8,376,000
Price Range
1BR 2BR 3BR
Units
Ready For Occupancy
Look at how our developments are expertly planned to suit up to your lifestyle.
24-hour Security
Convenience Store
Audio Visual Room
Fitness Gym
Multi-Purpose Area
Game Area
Gazebo/ Cabana
Grill Pits
Landscaped Gardens
Laundry Station
Lounge Area
Picnic/Grill Area
Electrified Perimeter Fence
Pool Deck
Pool Shower Area
Pool Water Slides
Provision for CCTV Cameras
Roof Deck
Sky Lounge
Standby Electric Generator
Tree-lined Walkways/Garden
Water Station
Each building is uniquely designed to complement the needs of its residents.
Deck Utility/ Service Area
Fire Alarm & Automatic Sprinkler System
Fire Hose Cabinets
Fire Exit
Garbage Rooms
Landscaped Atriums
Mailbox Area
Parking Space
Passenger Elevators
Provision for CCTV
Reception Lobby
Sky Patio (Lumiventt Technology)
Can't find the unit you want? Leave us your info and be the first to know when one becomes available!
PhP 4,437,000 - PhP 4,781,000
PhP 4,502,000 - PhP 4,781,000
PhP 5,692,000 - PhP 6,817,000
PhP 5,772,000 - PhP 6,830,000
PhP 4,502,000 - PhP 4,689,000
PhP 4,502,000 - PhP 4,781,000
PhP 4,437,000 - PhP 4,781,000
PhP 5,335,000 - PhP 6,281,000
PhP 7,299,000 - PhP 8,376,000
PhP 5,772,000 - PhP 6,830,000
PhP 5,692,000 - PhP 6,817,000
PhP 4,437,000 - PhP 4,781,000
PhP 5,416,000 - PhP 6,331,000
PhP 5,692,000 - PhP 6,817,000
PhP 5,772,000 - PhP 6,830,000
PhP 4,502,000 - PhP 4,781,000
Fire Alarm & Sprinkler System
Provision for CATV
Provision for Metered Utility
Provision for Phone Line
Disclaimer: In its continuing desire to improve the project, DMCI Homes reserves the right to change product features, prices, and terms without prior notice and approval. Floor plans and perspectives depicted are for demonstration purposes only and should not be relied upon as final project plans. Contact us for the most updated project information.
DMCI Homes is dedicated to delivering quality developments on time or even ahead of what we promised.
1 Photos
Hacana Building- dressup acceptance (30/338 Units); Final Paint (Top Coat) 12F, Installation of Vinyl Tiles (9F), Installation of Plumbing Fixtures (14F)
Lana Building- balcony skim coat at 8th Floor. T&B waterproofing at 10th Floor. T&B tiling at 7th Floor. Living-Dining-Kitchen tiling at 6th Floor. Balcony tiling at 10th Floor. Interior painting (skim coat) at 10th Floor. Panel door / main door installat
Rahu Building- ongoing exterior CHB laying at 15th floor. Hallway railings at 6th floor. T&B at 3rd floor. Unit hallway at 11th floor. Unit rubcon at penthouse. Ongoing plastering at 6th floor unit hallway. Unit partition at 11th floor. Door jamb installa
Yasu Building- ongoing CHB installation of the 1st Layer at 12th floor. Waterproofing at roof deck. Rubcon works in units at 6th floor. Rubcon works in exterior at 5th floor. CHB laying at EE Room in Penthouse.
Amani Building- ongoing structural works (formworks and rebar installation and concrete pouring) at penthouse.
Hacana Building Ground Floor Elevator
Hacana Building Ground Floor
Hacana Building Roof Deck Elevator
Hacana Building Roof Deck
Site Development
Driveway
1 Photos
Hacana Building
Hacana Building - 1st Atrium
Hacana Building - Main Entrance
Hacana Building - Sky Patio 1st Atrium
Lana Building
Lana Building - Aluminum Doors & Windows Installation
Lana Building - Hallway Skim Coat 8 Floor
Rahu Building
Rahu Building - Hallway Railings 8 Floor
Rahu Building - Roof Deck Right Wing
Yasu Building
Yasu Building - Installation of Doors for EE Room & Utility Room
Yasu Building - Roof Deck Perimeter
Amani Building
Site Development
1 Photos
Hacana Building
Hacana Building - 1st Atrium
Hacana Building - Guard Post and Archway
Hacana Building - AVR Room
Hacana Building - Main Entrance
Hacana Building - Roof Deck Sky Lounge
Hacana Building - Sky Patio
Lana Building
Lana Building - 2nd Left Wing Base Coat
Lana Building - Column Stone Cladding
Lana Building -8 Floor Water Proofing
Lana Building - Interior Plastering 14 Floor
Rahu Building
Rahu Building - Pipe Chase Tool Joint
Rahu Building - Plastering
Rahu Building - CHB Laying T&B 7 Floor
Yasu Building
Yasu Building - Roof Deck Perimeter
Yasu Building - CHB Laying EE Room 1st Layer
Yasu Building - Elevator CHB Laying 6 Floor
Amani Building
Site Development
1 Photos
Hacana Building- hallway cladding closure at PH; Installation of Sliding Window at PH; Hallway Tiling at PH, T&B Granite at 15F, Baseboard at PH, Acceptance of Painting Works at Rear and Left Elevation
Lana Building- ongoing interior CHB laying at 14F; Interior Plastering at 11F; Balcony Skimcoat at 7F; T&B Waterproofing at 7F, T&B Tiling at 3F, LDK Tiling at 2F, Balcony Tiling at 3F, Interior Painting (Skimcoat) at 8F
Rahu Building- ongoing CHB laying at 11F Unit Balcony; T&B at 3F; Unit Hallway at 11F; Unit Rubcon at 7F Ongoing Plastering at 5F Unit Hallway; Unit Partition at 11F; Door Jamb Installation at 15F; Balcony Railing at 3F, Waterproofing at 2F"
Yasu Building- ongoing T&B Zocalo at PH, Ongoing CHB Installation 1st Layer at 3F;
Amani Building- ongoing structural works (Concrete Pouring & Rebar Installation) at Second floor
Satori Residences
Entrance Gate
Site Development
Site Development
1 Photos
Hacana Building - Hallway Cladding Closure at 15F; Installation of Sliding Window at 12F; Hallway Tiling at 12F, T&B Granite at 15F, Baseboard at 8F, Exterior Sliding Doors at 12F
Left Elevation at Hacana Bldg 1
Ground Floor AVR Room at Hacana Bldg 1
Ground floor Open Lounge and Ceiling Framing installation at Hacana Bldg 1
Hall Way Cladding Framing at 16F Hacana Bldg 1
Hallway Cladding Ceiling Board Up at 15F Hacana Bldg 1
Hallway Tiling Works at 11F Hacana Bldg 1
Roof Deck Elevator Lobby at Hacana Bldg 1
Roof Deck Sky Lounge Kitchen at Hacana Bldg 1
Unit Drywall and Cladding Board Up at 12F Hacana Bldg 1
Site Development
Lana Building - Ongoing Interior CHB Laying at 12F; Interior Plastering at 10F; Balcony Skim Coat at 7F; T&B Waterproofing at 6F, T&B Tiling at 2F, LDK Tiling at 2F, Balcony Tiling at 2F
Atrium Left Wing Base Coat at 2nd Lana Bldg 2
Balcony Water Proofing at 3F Lana Bldg 2
Atrium Left Wing Plastering and Railing Installation at 3rd Lana Bldg 2
Water Proofing at 6F Lana Bldg 2
Unit Skim Coat at 7F Lana Bldg 2
Site Development Building at Lana Podium
Rahu Building - Ongoing CHB Laying at 11F Unit Balcony; T&B at 2F; Unit Hallway at 11F; Ongoing Plastering at 5F Unit Hallway; Unit Partition at 11F; Door Jamb Installation at 15F; T&B at 10F
CHB Laying Hallway at 6F Rahu Bldg 3
Site Development Building at Rahu Podium
Yasu Building - Ongoing T&B Zocalo at PH, Ongoing CHB Installation 1st Layer at 2F;
Amani Building - ongoing structural works at ground floor
Base Board at 8F
Site Development
Counterfort Area
Entrance
1 Photos
Hacana Building- Hallway Cladding Closure at 12F; Installation of Sliding Window at 12F; Hallway Tiling at 11F, T&B Granite at 8F, Baseboard at 5F, Exterior Sliding Doors at 12F
Hacana Building Ground Floor
Lana Building- Ongoing Interior CHB Laying at 11F; Interior Plastering at 9F; Exterior Plastering at PH, Balcony Skimcoat at 6F; T&B Waterproofing at 5F
Lana Building
Rahu Building- Ongoing CHB Laying at 8F Unit Balcony; T&B at GF; Unit Hallway at 11F; Ongoing Plastering at 4F Unit Hallway; Unit Partition at 4F; Door Jamb Installation at 15F; T&B at 10F
Yasu Building- Ongoing Planing at 15F; Ongoing T&B Zocalo at 10F
Amani Building- Ongoing Structural works at Groundfloor
1 Photos
Hacana Building- Hallway Cladding Closure at 8F; Installation of Sliding Window at 12F; Hallway Tiling at 5F, T&B Granite at 8F, Unit Cladding Board-Up at 11F, Baseboard at 4F, Exterior Sliding Doors at 12F
Hacana Building Hallway (2nd Floor)
Hacana Building Hallway Cladding Board up at 8th Floor
Hacana Building Under Atrium Ceiling Board up at 6th Floor
Hacana Building Hallway Cladding Framing at 16th Floor
Lana Building 11th floor Balcony Railing
Lana Building 2nd Atrium
Lana Building 5th Floor Interior Plastering
Lana Building 7th Floor Exterior
Lana Building Drying Cage
Rahu Building- Ongoing Interior CHB Laying at 9F; Hallway Plastering at 4F
Rahu Building CHB Laying Works at 9th floor Hallway
Rahu Building Hallway Plastering at 4th Floor
Yasu Building- Ongoing Planing at 10F; Ongoing T&B Zocalo at 8F
Yasu Building Zocalo
Amani Building- Ongoing Structural works at Ground floor
Site Development Hacana Building Podium
Site Development Lana Building Podium
Site Development Counterfort
Under water Tank
1 Photos
Hacana Building- Hallway Cladding Closure at 7F; Installation of Sliding Window at 12F; 2nd Skimcoating at PH; LDK Tiling at PH; Hallway Tiling at 5F ;Breezeway Waterproofing at 11F
Hacana Building Roof Deck
Hacana Building Roof Deck
Hacana Building 16th Floor Hallway Cladding
Hacana Building- 12th Floor Exterior Sliding Doors
Hacana Building- Penthouse Exterior Windows
Lana Building- Ongoing Interior CHB Laying at 6F; 4F Interior Plastering; Balcony Railing at 9F; Exterior Plastering at 9F, Unit Skimcoat at 2F; EE Room Painting Works at 5F
Lana Building - 11F plastering
Lana Building Laundry Cage
Lana Building 5th Floor Interior Plastering
Lana Building 10th Floor Railing
Rahu Building- Ongoing Exterior CHB Laying at 4F; Interior CHB Laying at 4F; Main Door Jamb at 4F; T&B Door Jamb at 5F
Rahu Building 2nd Floor plastering works
Rahu Building Roof Deck water proofing works
Yasu Building- Ongoing Planing at 3F; Ongoing T&B Zocalo at 5F
Site Development
Site Development
Site Development
1 Photos
Hacana Building- Hallway Cladding Closure at 7F; Installation of Sliding Window at 12F; 2nd Skimcoating at PH; LDK Tiling at PH; Hallway Tiling at 5F ;Breezeway Waterproofing at 11F
Hacana Building Roofdeck
Lana Building- Ongoing Interior CHB Laying at 6F; 4F Interior Plastering; Balcony Railing at 9F; Exterior Plastering at 9F, Unit Skimcoat at 2F; EE Room Painting Works at 5F
Lana Building penthouse hallway plastering
Rahu Building- Ongoing Exterior CHB Laying at 4F; Interior CHB Laying at 4F; Main Door Jamb at 4F; T&B Door Jamb at 5F
Rahu Building Ground Floor Plastering Works
Yasu Building- Ongoing Planing at 3F; Ongoing T&B Zocalo at 5F
Amani Building- Ongoing Structural works at Basement 1
1 Photos
Hacana Building- Ongoing Drywall Framing at 14F and Hallway Cladding Framing at 14F; Drywall Board up at 6F; Installation of Sliding Window at 11F; 2nd Skimcoating at 15F
Hacana Building 15F Hallway
Lana Building- Ongoing Interior CHB Laying at 5F; 3F Interior Plastering; Balcony Railing at 7F; Rubcon 8F
Lana Building 15F Hallway Plastering
Lana Building Ground Floor Exterior Skim Coat
Rahu Building- Ongoing Exterior CHB Laying at 3F; T&B Zocalo at PH, T&B Coring at 15F
Rahu Building 3F Exterior CHB Laying
Yasu Building- Ongoing Structural works at Roofdeck
Yasu Building- Ongoing Structural works at Roofdeck
Site Development
Site Development
Site Development
1 Photos
Hacana Building- Ongoing Drywall Framing at 10F and Hallway Cladding Framing at 14F; T&B Waterproofing and Tiling at 16F; Installation of Sliding Window at 11F; 2nd Skimcoating at 14F
Lana Building - 14th floor hallway plastering
Hacana Building- 9th floor Unit Drywall Framing
Lana Building- Ongoing Interior CHB Laying at 5F; 3F Interior Plastering; Main Door Jamb at PH; Rubcon 8F
Rahu Building Ongoing Exterior CHB Laying at 3F; T&B Zocalo at PH, T&B Coring at 15F
Yasu Building- Ongoing Structural works at Penthouse Beam and Slabs
Site Development- Hacana Building Podium
Site Development- Lana Building Podium
Site Development- Retaining Wall
1 Photos
Hacana Building- Ongoing Drywall Framing at 2F and Hallway Cladding Framing at 14F; T&B Waterproofing and Tiling at 16F; Installation of Sliding Window at 8F; 2nd Skimcoating at 12F
Lana Building- Ongoing Interior CHB Laying at 4F; 3F Interior Plastering; Main Door Jamb at PH; Rubcon 8F
Rahu Building-Ongoing Exterior CHB Laying at 3F; T&B Zocalo at 15F
Yasu Building- Ongoing Structural works at 12F Beam and Slabs
Amani Building
1 Photos
Hacana Building- Ongoing Drywall Framing at 2F and Hallway Cladding Framing at 8F; ongoing tiling at 6F - 8F, T&B Waterproofing and Tiling at 9F; Installation of Sliding Window at 6F
Hacana Building Hallway cladding at 14th Floor
Lana Building- Ongoing Interior CHB Laying at 4F; 3F Interior Plastering; Main Door Jamb at 12F; T&B Door Jamb at 10F
lana Building Interior Plastering
Rahu Building- Ongoing Structural works at Skylounge Beam and Slabs; Ongoing Zocalo at 12F
Rahu Building Structural works at skylounge
Yasu Building- Structural works at 8F - 9F Floor Beam and Slabs
Yasu Building Structural works at 8th Floor
Amani Building- Basement 1 SOG
1 Photos
Hacana Building- Ongoing Drywall Framing at 2F and Hallway Cladding Framing at 8F; ongoing tiling at 6F - 8F, T&B Waterproofing and Tiling at 9F; Installation of Sliding Window at 6F
Lana Building- Ongoing Interior CHB Laying at 4F; Exterior CHB Laying at 15F; GF Interior Plastering; Main Door Jamb at 7F; T&B Door Jamb at 6F; EE/Utility Room CHB Laying & Door Jamb at 15F
Rahu Building- Ongoing Structural works at RD Beam and Slabs; Ongoing Zocalo at 6F
Yasu Building- Ongoing Structural works at 7F Floor Beam and Slabs
Amani Building- Basement 1 SOG
1 Photos
Hacana Building- Ongoing Masonry Works at PH ; ongoing tiling at 2F - 8F
Lana Building- Ongoing Masonry Works at 2F - 12F; ongoing rubcon at 6F - 7F; ongoing plastering at GF - 5F
Rahu Building- Ongoing Structural works at PH Beam and Slabs
Yasu Building- Ongoing Structural works at 5F Floor Columns
1 Photos
Hacana Building- Ongoing Masonry Works at PH ; ongoing tiling at 2F - 5F; ongoing plastering at 9F - 15F
Lana Building- Ongoing Masonry Works at 9F - 14F; ongoing rubcon at 9F; ongoing plastering at GF - 5F
Rahu Building- Ongoing Structural works at 15th Floor Beam and Slabs
Yasu Building- Ongoing Strcutural works at 2nd Floor Columns
Amani Building
1 Photos
Hacana Building- Ongoing Masonry Works at 12F-PH ; ongoing tiling at 2F - 5F; ongoing plastering at 9F - 15F
Lana Building- Ongoing Masonry Works at 3F - 9F; ongoing rubcon at 6F; ongoing plastering at GF - 5F
Rahu Building- Ongoing 12TH Floor Beam and Slabs
Yasu Building- Ground Floor Beam and Slabs
Amani Building- Basement 1 SOG
1 Photos
Hacana Building- Completed Areas for twelfth floor (4/5), On going concreting works at twelfth floor
Lana Building- Completed Areas for fourth floor (4/5), On going concreting works at fourth floor
Hacana and Lana Building
Rahu Building- Slab on Grade Panels, Done
Yasu Building- Slab on Grade Panels, Done
Amani Building- Complete Slab on Grade Panels (52/52)
1 Photos
Hacana Building- Completed Areas for tenth floor (3/5), On going concreting works at tenth floor
Hacana Building
Lana Building- Completed Areas for second floor (5/5), On going rebar works and formworks at third floor
Hacana and Lana Building
Rahu Building- Ongoing construction of columns at basement 2
Yasu Building- Ongoing construction of columns at basement 2
Amani Building- Completed Slab on Grade Panels (52/52)
1 Photos
Hacana Building- Status: Completed Areas for sixth floor (5/5), On going rebar works and formworks at 7th floor
Lana Building- Status: On going concreting works at GF, Completed Areas of GF (4/8)
Rahu Building- Status: Ongoing construction of columns at basement 2
Yasu Building- Status: Ongoing construction of columns at basement 2
Amani Building- Status: Completed Slab on Grade Panels (52/52)
1 Photos
Hacana Building- Completed Areas for fifth floor residential (2/5), On going concreting works on suspended slab at fifth floor residential
Lana Building- Completed areas of B1 (10/10), On going construction of columns at B1
Rahu Building- Ongoing construction of columns at basement 2
Yasu Building- Ongoing construction of columns at basement 2
Amani Building- Ongoing construction of Slab on Grade (Area - 48/52 panels)
Latest headlines and updates on news from DMCI. Find breaking stories, upcoming events and expert opinion.
March 13, 2023
Hacana, the first building of DMCI Homes’ Satori Residences condo project in F. Pasco Avenue, Santolan, Pasig, is already complete and...
February 21, 2023
Satori Residences residents can stream videos all they want with the community’s unlimited fiber internet service. (Image by Jade...
September 30, 2019
No matter how alluring the features or how exciting the attractions, having a great location is still the ultimate lifestyle amenity that co...
September 12, 2019
Premier Quadruple A developer DMCI Homes is set to widen its footprint in Eastern Metro Manila with a new project adjacent to its top-sellin...
its time to get excited again, we got new place that almost ready for occupancy