Allegra Garden Place
Pasig
1BR 2BR 3BR STUDIO
P 4,764,000 - P 13,388,520
DMCI Homes Corporate Center, 1321 Apolinario Street, Bangkal, Makati City, Metro Manila, PH 1233
Pasig Boulevard, Brgy. Bagong Ilog
4,562,000 - 12,174,000
Price Range
1BR 2BR 3BR
Units
Ready For Occupancy
Look at how our developments are expertly planned to suit up to your lifestyle.
24-hour Security
Drop-Off Area
Basketball Court/Playcourt
Convenience Store
Audio-Visual Room
Fitness Gym
Function Hall
Game Room
Landscaped Gardens
Laundry Station
Open Lounge
Perimeter Fence
Palm Deck
Pool Shower Area
Provision for CCTV Cameras
Sky Lounge
Standby Electric Generator
Observatory Deck
Water Station
WiFi Access
Each building is uniquely designed to complement the needs of its residents.
High Rise Condominiums
45 Levels
Residential
6 Level
Basement Parking
Fire Alarm & Automatic Sprinkler System
Fire Cabinets
Fire Exit
Garbage Rooms
Landscaped Atriums
Mailbox Area
Parking Space
Passenger Elevators
Provision for CCTV
Reception Lobby
Can't find the unit you want? Leave us your info and be the first to know when one becomes available!
PhP 7,156,000 - PhP 12,174,000
PhP 4,562,000 - PhP 5,474,000
PhP 6,705,000 - PhP 8,781,000
PhP 7,879,000 - PhP 8,123,000
PhP 8,027,000 - PhP 10,276,000
PhP 5,402,000 - PhP 5,834,000
PhP 5,402,000 - PhP 5,834,000
PhP 5,039,000 - PhP 5,806,000
PhP 6,705,000 - PhP 8,781,000
PhP 9,869,000 - PhP 9,869,000
PhP 5,039,000 - PhP 5,806,000
Fire Alarm & Sprinkler System
Provision for CATV
Provision for Metered Utility
Provision for Phone Line
Disclaimer: In its continuing desire to improve the project, DMCI Homes reserves the right to change product features, prices, and terms without prior notice and approval. Floor plans and perspectives depicted are for demonstration purposes only and should not be relied upon as final project plans. Contact us for the most updated project information.
DMCI Homes is dedicated to delivering quality developments on time or even ahead of what we promised.
1 Photos
Celeste Building- Topped Out; CHB Laying at PH left (Unit); Plastering (7th and 8th ATR left); Exterior BaseCoat 22F; Waterproofing 25F; On Going Roofdeck Amenities (Sky Lounge 72.46%)
Celeste Building Roof Deck
Celeste Building Roof Deck
Kiran Building- Structural Completed; CHB Masonry works ongoing up to 17F (Unit) and 34F (Common Area); Rubcon at 38F Completed and Masonry On Going at 22F (Exterior)
Site Development
1 Photos
Prisma Residences
Celeste Building- topped out; CHB Laying at PH left (Unit); Plastering (7th and 8th ATR left); Exterior BaseCoat 22F; Waterproofing 25F; On Going Roofdeck Amenities
Celeste Building - Atrium
Celeste Building - Roof Deck
Kiran Building- structural completed; CHB Masonry works ongoing up to 17F (Unit) and 34F (Common Area); Rubcon at 38F Completed and Masonry On Going at 22F (Exterior)
Kiran Building - Atrium
Kiran Building - Unit
Site Development
1 Photos
Prisma Residences
Prisma Residences
Astra Building- topped-out (Structural); T&C Plumbing Inspection On Going (7ATR accepted), Ongoing Dress Up Acceptance - (5ATR accepted)
Celeste Building- topped out; CHB Masonry works ongoing up to 33F (Unit); Rubbed concreting up to PH; Exterior BaseCoat 22F; Waterproofing 25F
Kiran Building- active floor ongoing concreting and rebar works at 45F, Formworks at 45-46F and rebar works at 45-46F; CHB Masonry works ongoing up to 12F (Unit).
2 Photos
Astra Building - topped-out (structural); T&C plumbing inspection on going, 5 atriums accepted
Astra Building - Roof Deck
Astra Building - Roof Deck
Astra Building - Residential Floor
Astra Building - Residential Floor
Astra Building - Residential Floor
Astra Building - Residential Floor
Astra Building - Basement
Astra Building - Basement
Astra Building - Ground Floor
Astra Building - Ground Floor
Astra Building - Ground Floor
Astra Building - Ground Floor
Astra Building - Sky Lounge
Astra Building - Sky Lounge
Astra Building - Perimeter Fence
Celeste Building - topped out; CHB masonry works ongoing up to 31F (unit); rubbed concreting up to 41F; exterior base coat 22F; waterproofing 25F
Celeste Building - Side View (C5 Side)
Celeste Building - Side View (Allegra Side)
Celeste Building - Residential Floor
Celeste Building - Residential Floor
Celeste Building - Residential Floor
Celeste Building - Residential Floor
Celeste Building - Residential Floor
Celeste Building - Basement
Celeste Building - Basement
Celeste Building - Basement
Celeste Building - Roof Deck
Celeste Building - Roof Deck
Celeste Building - Roof Deck
Celeste Building - Roof Deck
Celeste Building - Roof Deck
Celeste Building - Open Deck
Celeste Building - Sky Lounge
Celeste Building - Machine Room
Kiran Building - active floor ongoing concreting and rebar works at 44F, formworks at 44-45F and rebar works at 44-45F; CHB masonry works ongoing up to 12F (unit)
Kiran Building - (Side Elevation)
Kiran Building - Building C
Kiran Building - Building C
Kiran Building - Residential Floor
Kiran Building - Residential Floor
Kiran Building - Residential Floor
Kiran Building - Residential Floor
Kiran Building - Residential Floor
Kiran Building - Basement
Kiran Building - Basement
Site Development Perimeter Fence
Drive Way Perimeter Fence
Basketball Area Perimeter Wall
Jogging Path Perimeter Fence
View Deck
View Deck
Drive Way
Drive Way
Pool Area
Pool Area
Pool Area
Pool Area
Gate and Guard House
Kiran, Astra & Celeste Building (Left to Right)
Prisma Residences
Astra Building Lobby
Astra Building Reception Area
Amenity Core
Drive Way
Amenity Core
Drive Way
Lap Pool
1 Photos
Prisma Residences
Astra Building- Topped-Out (Structural); Dress Up Works and T&C MEPF Inspection On Going
Astra Building Ground Floor
Astra Building Ground Floor
Astra Building Ground Floor
Astra Building Elevator Lobby
Astra Building Roofdeck
Astra Building Roofdeck
Astra Building Roofdeck
Celeste Building- Topped Out; CHB Masonry works ongoing up to 28F (Unit); Rubbed concreting up to 37F; Exterior BaseCoat 22F; Waterproofing 21
Celeste Building Roofdeck
Celeste Building Roofdeck
Kiran Building- Active Floor ongoing concreting and rebar works at 40F, Formworks at 40-41F and rebar works at 40-41F; CHB Masonry works ongoing up to 9F (Unit)
Entrance
Entrance Gate
Driveway
Driveway
Amenity Core
1 Photos
Prisma Residences
Astra Building- topped-Out (Structural); Dress Up Works and T&C MEPF Inspection On Going
Astra Building Atrium
Astra Building Snack Bar
Astra Building Roof Deck
Astra Building Roof Deck
Astra Building Reception Lobby
Celeste Building- Topped Out; CHB Masonry works ongoing up to 23F (Unit); Rubbed concreting up to 33F; Exterior BaseCoat 22F; Waterproofing 14F
Kiran Building- active floor ongoing concreting and rebar works at 37F, Formworks at 37-38F and rebar works at 37-38F; CHB Masonry works ongoing up to 9F (Unit)
Prisma Residences at night
1 Photos
Prisma Residences
Astra Building- Topped-Out (Structural); Masonry works and Plastering done, Skim Coating at 35F, Painting at 31F
Astra Building Entrance Lobby
Kiran Building- Active Floor ongoing concreting and rebar works at 33F, Formworks at 33-34F and rebar works at 33-34F; Masonry ongoing at 6F
Site Development
Entrance Gate
Entrance
Site Development
View Deck
Site Development
Astra Building Roof deck
Astra Building Roof deck
1 Photos
Astra Building- Topped-Out (Structural); Masonry works and Plastering done, Skim Coating at 35F, Painting at 31F
Astra Building Dress Up Unit
Astra Building Dress Up Unit
Astra Building Roof Deck
Celeste Building- On-going concrete pouring & rebar works columns at 39F Area 4 & 5; Pre Masonry at 30F; Masonry works ongoing up to 18F (Unit); Rubbed concreting up to 17F
Celeste Building Hallway
Kiran Building Atrium
Kiran Building Hallway
Kiddie Pool
Lap Pool
Lounge Pool
Kiran Building- On-going concrete pouring for at 28F Area 3&4, Formworks at 28F and rebar works at 29F; Masonry ongoing at 4F
Prisma Residences
1 Photos
Prisma Residences
Sugi Building- Topped-Out (Structural); Masonry works and Plastering done.
Celeste Building- On-going concrete pouring & rebar works columns at 39F Area 4 & 5; Pre Masonry at 27F; Masonry works ongoing up to 18F (Unit); Rubbed concreting up to 17F
Kiran Building- On-going concrete pouring for Column at 19F Area 4&5, Formworks at 20F Area 3 and rebar works at 20F Area 1&2; Masonry ongoing at 4F
Site Development
Electric Fence
1 Photos
Astra Building First Atrium
Celeste Building 2nd Atrium
Prisma Residences
Celeste Building- On-going concrete pouring & rebar works columns at 37F Area 1 &2; Masonry works ongoing up to 18F (Unit); Rubbed concreting up to 17F
Kiran Building- On-going concrete pouring for Column at 19F Area 4&5, Formworks at 20F Area 3 and rebar works at 20F Area 1&2; Masonry ongoing at 4F
1 Photos
Prisma Residences
Astra Building- Topped-Out (Structural); Masonry works ongoing at 40F (Unit); Rubbed concreting up to 39F
Astra Building First Atrium
Astra Building Second Atrium
Astra Building 3rd Atrium
Celeste Building- On-going concrete pouring & rebar works at 34F Area 1; Masonry works ongoing up to 18F (Unit); Rubbed concreting up to 17F
Celeste Building First Atrium
Kiran Building- On-going concrete pouring & rebar works at 18F Area 1-3 and 17F Area 4-5
Site Development (Pool Area)
1 Photos
Astra Building- Topped-Out (Structural); Masonry works at 35F (Unit); Rubbed concreting up to 45F
Kiran Building- On-going concrete pouring & rebar works at 16F Area 3
Celeste Building- On-going concrete pouring & rebar works at 33F Area 1; Masonry works up to 7F (Unit); Rubbed concreting up to 14F
Site Development
1 Photos
Astra Building- Topped-Out (Structural); Masonry works at 34F (Unit); Rubbed concreting up to 41F
Astra Building First Atrium
Astra Building Second Atrium
Astra Building Third Atrium
Astra Building Fourth Atrium
Astra Building Roof Deck
Celeste Building- On-going concrete pouring & rebar works at 31F; Masonry works up to 7F (Unit); Rubbed concreting up to 14F
Celeste Building Third Atrium
From Left to Right- Celeste, Astra and Kiran Building
Kiran Building Ground Floor
1 Photos
Astra Building- Topped-Out (Structural); Masonry works at 31F (Unit); Rubbed concreting up to 38F
Kiran Building- On-going concrete pouring & rebar works at 12F
Celeste Building- On-going concrete pouring & rebar works at 29F; Masonry works up to 7F (Unit); Rubbed concreting up to 14F
Astra Building Roof Deck
Pool
Prisma Residences (Allegra Side)
1 Photos
Astra Building- On-going concrete-pouring & rebar works at 41F; Masonry works at 27F (Unit); Rubbed concreting up to 33F
Astra Building Active Floor (Roofdeck)
Celeste Building- On-going concrete pouring & rebar works at 26F; Masonry works up to 7F (Unit); Rubbed concreting up to 14F
Celeste Building Active Floor (25th)
Kiran Building- On-going concrete pouring & rebar works at 10F
Kiran Building Active Floor (9F)
1 Photos
Astra Building- On-going concrete-pouring & rebar works at 41F; Masonry works at 26F (Unit); Rubbed concreting up to 29F
Astra Building Active Floor (42nd)
Celeste Building- On-going concrete pouring & rebar works at 24F; Masonry works up to 7F (Unit); Rubbed concreting up to 11F
Celeste Building Active Floor 25th
KIran Building- On-going concrete pouring & rebar works at 9F
KIran Building Active Floor 9F
1 Photos
Astra Building- On-going concrete pouring & rebar works at 38F; Masonry works at 25F (Unit); Rubbed concreting up to 20F
ASTRA - ACTIVE FLOOR (38TH)
Astra Building Basement
Astra Building Ground Floor
Celeste Building- On-going concrete pouring & rebar works at 22F; Masonry works up to 8F (Unit); Rubbed concreting up to 9F
CELESTE - ACTIVE FLOOR (22ND)
Celeste Building Basement
Kiran Building- On-going concrete pouring & rebar works at 6F
KIRAN ACTIVE FLOOR 6F
Kiran Building Basement
1 Photos
Astra Building- On-going concrete pouring & rebar works at 36F; Masonry works at 24F (Unit); Rubbed concreting up to 20F
Astra Building Basement
ASTRA - ACTIVE FLOOR (36TH)
Astra Building Ground Floor
Astra Building Atrium
Astra Building Residential Floor
Astra Building Residential Floor
Astra Building Residential Floor
Celeste Building- On-going concrete pouring & rebar works at 20F; Masonry works up to 8F (Unit); Rubbed concreting up to 8F
CELESTE - ACTIVE FLOOR (20TH)
Celeste Building Basement
Celeste Building Residential Floor
Celeste Building Residential Floor
Kiran Building- On-going concrete pouring & rebar works at 4F
KIRAN ACTIVE FLOOR 4F
Kiran Building Basement
1 Photos
Astra Building- On-going concrete pouring & rebar works at 35F; Masonry works at 23F (Unit); Dryworks at 3F
ASTRA - ACTIVE FLOOR (35TH)
ASTRA - GROUND FLOOR
Astra Basement
Celeste Building- On-going concrete pouring & rebar works at 19F; Masonry works up to 7F (Unit); Rubbed concreting up to 6F
CELESTE - ACTIVE FLOOR (19TH)
Celeste Basement
CELESTE - RESIDENTIAL FLOOR
Kiran Building- On-going concrete pouring & rebar works at 3F
KIRAN ACTIVE FLOOR 2F/3F
Kiran Basement
1 Photos
Astra Building - On-going concrete pouring & rebar works at 33F; Masonry works at 21F (Unit); Dryworks at 2F
ASTRA - ACTIVE FLOOR (33RD)
Astra Building Basement
Astra Building Ground Floor
Astra Building Residential Floor
Astra Building Residential Floor
Celeste Building- On-going concrete pouring & rebar works at 17F; Masonry works up to 7F (Unit); Rubbed concreting up to 5F
CELESTE - ACTIVE FLOOR (17TH)
Celeste Building Basement
Celeste Building Residential Floor
Celeste Building Residential Floor
Kiran Building- On-going concrete pouring & rebar works at 2F
KIRAN ACTIVE FLOOR GF/2F
Kiran Building Basement
1 Photos
Astra Building- On-going concrete pouring & rebar works at 31F; Masonry works at 21F (Unit); Dryworks at 2F
Astra Building Active Floor (31st)
Astra Building Basement
Astra Building Ground Floor
Astra Building Residential Floor
Astra Building Residential Floor
Celeste Building- On-going concrete pouring & rebar works at 16F; Masonry works up to 7F (Unit); Rubbed concreting up to 5F
Celeste Building Active Floor (16th)
Celeste Building Basement
Celeste Building Residential Floor
Kiran Building- On-going concrete pouring & rebar works at GF
Kiran Building Basement
1 Photos
Astra Building- On-going concrete pouring & rebar works at 30F; Masonry works at 19F (Unit); Dryworks at 2F
Celeste Building- On-going concrete pouring at 14F & rebar works at 15F; Masonry works up to 7F (Unit); Rubbed concreting up to 4F
Astra Building (Active floor- 30th)
Astra Building (Basement)
Astra Building (Ground Floor)
Astra Building Residential Floor
Astra Building Residential Floor
Astra Building Residential Floor
Astra Building Residential Floor
Celeste Building (Active floor- 14th)
Celeste Building Basement
Celeste Building Residential Floor
Celeste Building Residential Floor
Kiran Building- On-going concrete pouring & rebar works at GF
Kiran Building Basement
1 Photos
SIDE VIEW - ASTRA (Along Pasig Blvd.)
FRONT VIEW - ASTRA (Along C5)
ASTRA - ACTIVE FLOOR (27TH)
ASTRA - BASEMENT
ASTRA - GROUND FLOOR
ASTRA - RESIDENTIAL FLOOR
ASTRA - RESIDENTIAL FLOOR
Celeste Building
CELESTE - ACTIVE FLOOR (11TH)
CELESTE - Basement
CELESTE - RESIDENTIAL FLOOR
BUILDING C - KIRAN - ACTIVE FLOOR (BASEMENT 1)
KIRAN - BASEMENT
1 Photos
Astra Building- On-going installation of formworks & rebar at 24F; Masonry works at 14F (Unit); Dryworks at 2F
Astra Building active floor (24th)
Astra Building Basement
Astra Building Ground Floor
Celeste Building
Celeste Building active floor (10th)
Celeste Building Basement
Kiran Building active floor (basement 1)
Kiran Building Basement
1 Photos
Astra
Astra - On-going installation of formworks & rebar at 20th floor, Masonry works at 9th floor (interor), 12th floor (exterior).
Celeste - On-going installation of rebar and formworks for 6th floor, stripping works at 4th floor, rubbed concreting works up to B2.
Kiran - On-going rebar and formworks installation at basement 3, stripping works at basement 5.
1 Photos
Astra building - On-going installation of formworks & rebar at 10F, masonry works at 4F.
Astra Ground Floor
Astra Atrium
Astra Basement 6 Parking
Celeste building - On-going installation of rebar and formworks for Ground Floor. Stripping works at basement 1-4. Rubbed concreting works at basement 5.
Kiran building - Finished mat footing works. On-going rebar and formworks installation at basement 5.
1 Photos
Astra Building - On-going installation of formworks & rebar at 3F, masonry works at B1.
Astra Basement Parking
Celeste Building - On-going soil excavation, soil nailing and installation of rebar and formworks for basement parking level.
Kiran Building - On-going excavation for mat footing, haul out of excavated soil, finished additional soil nailing works.
Latest headlines and updates on news from DMCI. Find breaking stories, upcoming events and expert opinion.
May 2, 2023
Prisma Residences’ second building, Celeste, has achieved a ready-for-occupancy status, allowing unit owners to start moving into thei...
May 28, 2022
Quadruple A developer DMCI Homes has started the turnover process of the newly-completed first building of its Prisma Residences development...
August 18, 2021
Construction of Prisma Residences, DMCI Homes’ three-tower development in Pasig City, remains on track despite limitations caused by t...
September 6, 2019
Prisma Residences, DMCI Homes’ three-tower development along Pasig Boulevard in Brgy. Bagong Ilog, Pasig City is now down to the last ...